MRP
Material requirements planning
Before you can make something you must know what you need, how much of it you already have and how long each part takes to arrive. Material planning does that sum for you: it takes the orders and the forecast, breaks every product down into its parts, subtracts the stock and the orders already placed, and tells you what to buy or make, and by which date. That calculation is called MRP, short for material requirements planning.
Three inputs drive the calculation: demand (customer orders and forecast), the bill of materials that lists the parts of each product, and the stock position, meaning what is on hand and what is already on order, together with the lead time of each part. The output is a list of planned purchase orders and production orders with dates.
MRP is only as good as its inputs. A wrong lead time, or a stock figure that does not match the shelf, produces confident but wrong orders. The later version, often called MRP II, also checks capacity: whether the machines and people exist to make what the plan asks for.
In practice
A workshop receives an order for 100 tables, each with four legs. The calculation needs 400 legs. There are 150 in stock and 100 on order from the supplier, so 150 more must be ordered. The legs take three weeks to arrive and the tables are due in five, so the order has to go out within two weeks.
Further reading
Ready to see BizBloqs on your own process?
Book a demo and we will walk your warehouse and order flow end to end — inbound, storage, picking, shipping, returns — and tell you honestly what BizBloqs would change.
Two questions about your own operation
How many of your articles sit in a pick location they empty less than once a month?
Part one: Laying out a warehouse does not start with the racking
After your last integration, how many systems hold a stock quantity for the same item? Name them.