Bill of materials
BOM
To make one finished product you need a fixed list of parts and the quantity of each: for a chair, four legs, one seat, one back and sixteen screws. Written down once as a recipe, the list is used to work out what to buy, what to take from stock and what the product costs to make. That recipe is called a bill of materials, or BOM.
A bill of materials can have levels. A bicycle needs a wheel, the wheel needs a rim, spokes and a tyre, and each of those is bought or made. Each level is its own list, and the lists together are a multi-level BOM. The one used in the factory (the manufacturing BOM) can differ from the one the designer drew (the engineering BOM), because the factory may use a substitute part or a different packing.
The BOM is the input that material requirements planning multiplies by the quantity ordered, and the same list tells a warehouse what to pick for a kit or an assembly job. An out-of-date list is expensive in a quiet way: the system keeps ordering a part nobody uses and runs short of the one that replaced it.
In practice
A workshop makes a garden table from one top, four legs, four brackets and sixteen screws. An order for 25 tables therefore needs 25 tops, 100 legs, 100 brackets and 400 screws. The system subtracts what is on the shelf and on order, and the remainder goes to purchasing.
Further reading
Ready to see BizBloqs on your own process?
Book a demo and we will walk your warehouse and order flow end to end — inbound, storage, picking, shipping, returns — and tell you honestly what BizBloqs would change.
Two questions about your own operation
How many of your articles sit in a pick location they empty less than once a month?
Part one: Laying out a warehouse does not start with the racking
After your last integration, how many systems hold a stock quantity for the same item? Name them.