Dock-to-stock time

A lorry arrives at eight in the morning. The pallets are unloaded, checked against the delivery note and put away in their locations, and at five past twelve the system releases them for sale. Four hours and five minutes. The time between a delivery arriving on your site and its contents being available to pick is called dock-to-stock time.

How dock-to-stock time is calculated

Take the elapsed time of each receipt and average it over the period. The two definitions that decide what you measure sit at the two ends of the clock.

Start it when the vehicle arrives on site, not when unloading begins. A trailer that waits four hours in the yard is four hours without available stock, and that queue is usually yours, not the carrier's.

Stop it when the stock becomes pickable. This is the end that gets moved quietly, because the putaway booking is easier to timestamp. But a pallet sitting in a putaway aisle with its paperwork done is not stock: nobody can pick it, and an order against it stays incomplete. Measuring to availability is more work and the only version a planner can use.

As with order cycle time, the average and the slow tail belong together in the report. The average describes your process; the tail describes the deliveries that caused the problems.

There is no good number

A food retailer's distribution centre cross-docking chilled goods works in minutes. A machinery importer whose containers have to be unpacked, counted and partly assembled works in days, and neither figure says anything about the other.

What the number is for is the gap between your own best and worst receipts, because that gap almost always has a specific, fixable cause: a supplier who gives no advance notice, a product group that needs a release, a weekday when three containers arrive together.

Worked example

A warehouse handles 420 receipts in a month. The average dock-to-stock time is six hours, which reads well.

Sort them. Three quarters of the receipts were done in under four hours. About forty took between one and three days: twenty-two arrived without a time slot and waited for a free dock door, twelve needed a quality release, and six came on pallets whose labels did not match the delivery note and had to be counted piece by piece.

Those slow forty are nearly the whole problem. They have three different causes, not one, and the six-hour average names none of them. The figures here are an example.

What moves the number

  • Delivery slots, and enforcing them. The biggest single cause of a long tail is usually vehicles that arrive when nobody expects them.
  • Advance notice from the supplier. A receipt you can see coming, through an advance shipping notice, can be planned, labelled and staffed. A surprise cannot.
  • Label and packaging quality on the inbound side. A pallet whose cartons scan is put away in minutes. One that has to be opened and counted takes an hour.
  • Putaway staffing against the arrival pattern. Goods in is almost always short-staffed at the arrival peak and overstaffed in the afternoon, because the rota was written around dispatch.
  • Quality and regulatory holds. Real, legitimate, and worth reporting separately so that they do not hide the rest.
  • Whether cross-docking is allowed. For goods already allocated to an order, going straight from dock to dispatch removes the whole figure, and that needs a system that knows the demand exists.

Frequently asked questions

Where exactly does the clock stop?

When the stock is available to pick, not when it is physically put away. A pallet sitting in a putaway aisle with its paperwork done is not yet stock, and measuring to the putaway booking makes that difference disappear.

Does the clock start when the lorry arrives or when unloading begins?

On arrival at the site, if you want the honest figure. A trailer that waits four hours in the yard is four hours in which the stock is unavailable, and that queue is usually yours.

Why does it matter if dispatch is running well?

Because stock you have paid for and cannot sell is the most expensive stock in the building. In fast-moving trades it is also a quiet cause of stock-outs on items that are physically on site.

Should quality holds be included?

Include them and flag them. A two-day regulatory release is not a warehouse fault, but it belongs in the figure, because planning needs to know when the stock is really sellable and not when it arrived.

Ready to see BizBloqs on your own process?

Book a demo and we will walk your warehouse and order flow end to end — inbound, storage, picking, shipping, returns — and tell you honestly what BizBloqs would change.

Two questions about your own operation

Book a demo