A parcel sorter is planned to run for 8 hours. It runs for 7. While it runs it handles four-fifths of the volume it was built for, and 99 of every 100 parcels reach the right chute. Multiply the three and the sorter delivered about 69 percent of what it could have. That figure is OEE, overall equipment effectiveness.

How to calculate OEE

OEE multiplies three factors.

Availability is the time the equipment actually ran, divided by the time it was planned to run. Planned time, not calendar time: a sorter that is not scheduled on Sunday has lost nothing on Sunday.

Performance is what the equipment handled while running, divided by what it would have handled at its nominal rate over the same running time.

Quality is the share of output that was good the first time. For a sorter, that is a parcel in the right chute.

Multiply the three. Because they multiply, a machine that scores 90 percent on each factor scores 73 percent overall, not 90.

OEE fits machine-paced equipment: sorters, conveyors, palletisers, automated storage and automated vehicle fleets. It does not fit manual picking, where nothing sets a rate for the person to run against. There, picks per hour is the measure to use.

There is no good number

Published OEE figures are the least comparable of all warehouse measures. They depend on the nominal rate someone chose, and on what that site counts as planned time. Two sites can run the same machine in the same way and report quite different numbers.

So use the figure for your own trend, and read the three factors rather than the product. The product tells you that something is lost. The factors tell you where.

In practice

The sorter was planned for 480 minutes and lost 60 to stops, so it ran 420. Availability is 420 divided by 480, which is 87.5 percent.

Its nominal rate is 6,000 parcels an hour, so 7 hours could have handled 42,000. It handled 33,600. Performance is 33,600 divided by 42,000, which is 80 percent. Much of the gap was the sorter waiting for parcels to arrive from the packing stations.

Of the 33,600, 336 went to the wrong chute. Quality is 99 percent.

OEE is 0.875 × 0.80 × 0.99 = 0.693, or 69.3 percent. The numbers here are an illustration, not a benchmark.

What moves the number

  • How the machine is fed. A sorter is only as fast as the packing stations that feed it. If they deliver in bursts, the machine idles between them, and the loss shows up as performance, not availability.
  • Why it jams. Parcel shape, loose tape and curled labels cause most short stops. Count them by cause for a week and the top one is usually obvious.
  • Planned maintenance against breakdown. Planned stops are part of planned time when you schedule them, and a loss when they happen without warning. Moving work from the second kind to the first lifts availability.
  • The nominal rate. Decide whether the reference rate is the one from the acceptance test or the one from the brochure. They differ, and the choice moves performance more than any improvement project will.
  • Changeovers. Switching a line from one parcel type or carton size to another costs running time. Count it, because it is easy to lose in the average.
  • Why parcels go to the wrong chute. Unreadable labels, a damaged barcode and bad address data all count against quality. Quality shares its causes with first time right, so a fix in one helps the other.

Frequently asked questions

Does OEE belong in a warehouse?

For machine-paced equipment, yes: sorters, conveyors, palletisers, automated storage and automated vehicle fleets. For manual picking it does not fit, because there is no machine rate to measure against. Use picks per hour there.

Availability against which clock?

Against planned production time, not calendar time. A sorter that is not scheduled on Sunday has not lost availability on Sunday. What counts as planned time is the first thing to agree, because it moves every other figure.

Which factor is usually the weakest?

Performance. Equipment that runs slowly, waits for feed or stops for short jams loses far more than it loses to breakdowns, and short losses rarely get written down.

Why is our OEE so low?

Because the three factors multiply. Three factors at 90 percent each give 73 percent, not 90. Ordinary results look poor next to the figure people expect, and the arithmetic is not at fault.